13 BOILER ESSENTIAL FITTING


As per the Factories Act and Boiler Regulations in India, some essential fittings for a boiler typically include:

1. Safety Valve
2. Pressure Gauge
3. Water Level Indicator
4. Feed Check Valve
5. Blowdown Valve
6. Fusible Plug
7. Steam Stop Valve
8. Feed Water Inlet
9. Manhole or Handhole Covers
10. Mud Drum (if applicable)
11. Superheater Safety Valve (if applicable)
12. Boiler Mountings (e.g., pressure gauge, water level gauge)
13. Drain Valve

These fittings ensure safe operation, monitoring, and maintenance of the boiler. Specific requirements may vary depending on the jurisdiction and type of boiler.

Differences between FD Fan and ID Fan

FD Fan
ID Fan
Forced draft fan
Induced draft fan
used basically for providing the required quantity of hot air to the furnace for smooth and uniform combustion of fuel
Located between dust collector and chimney
FD fan will supply required air for the combustion of the fuel in the furnace
ID fan will take the hot flue gases from furnace and will deliver to chimney.
FD fan will produce the positive pressure inside the system i.e. furnace
ID fan will produce the negative pressure in the furnace to remove the flue gases
Handle cold air

Handle hot gas, hence more power is required

Less maintenance , consume less power as density of cold air is less.

Cope with corrosive combustion products and fly ash

Is much smaller than ID fan.
 Size is largest as it exhaust all air (secondary air and primary air) and is first to start as is necessary for safe boiler operation to prevent pressurization of boiler.

Whether caustic (NaOH) can be used as pH booster in HP dosing in place of TSP?

Caustic can be used in HP dozing, but not in place of TSP. Rather it can be used along with TSP. If for some reason, your boiler pH is going down, but your phosphate level is ok, then one can use Caustic to increase the Na:PO4 molar ratio. Only thing is that you must check the M and P alkalinity of Boiler Water and maintain it less than equal to 0

Visual Inspection of Soot Blowers



Soot blowers can be a root cause for deterioration if they are not operating properly. Therefore, soot-blower parts should be inspected for proper alignment, position, and operability. If soot blowers are out of position or misaligned, the blower blast could impinge on tubes which will eventually cause tube failure due to erosion. Soot blowers can also be a source of liquid water that can promote dew point corrosion of tubes, casing and the blowers themselves. The shut-off valve to the blowers should be checked to ensure it does not leak while in service. Condensate can form in the system when the blower is out of service and if it leaks into the firebox can cause dew point corrosion.

The blower, supporting hangers, and brackets should be examined visually for soundness and for excessive thinning from oxidation. Soot blowers for the high-temperature part of the boiler are sometimes composed of high-chromium alloys that embrittle in service and so they should be handled/inspected appropriately to avoid fracture. Connection welds of supporting elements should be inspected for cracks. If the welds look cracked, a magnetic-particle inspection should be made. Packing glands and all operating parts of the rotating and retracting types of soot blowers should be examined for good working condition. Because of the potential difficulty of repacking soot blowers in service, repacking should be done during down periods if there is any evidence that repacking might be required.

Inspection of Stacks



An external visual inspection should be made of brick, concrete, and steel stacks for conditions that may weaken these structures. Field glasses will be helpful in making inspections of high stacks because they will enable any defects to be observed fairly well from the ground. Brick stacks should be inspected for cracks and for the condition of mortar joints to determine the effect of weathering. Concrete stacks should be inspected for cracks and spalling that may expose the steel reinforcement. Steel stacks should be inspected externally for the condition of painted surfaces, signs of oxidation, and thinning or perforation due to corrosion by acidic flue gases.

In many cases, cracks in brick and concrete stacks are a result of insufficient thickness of the internal insulation or to internal secondary combustion. These potential causes of cracks should be kept in mind when inspecting the interior of stacks.

The linings of all stacks should be inspected for cracks, wear, and structural soundness.

While stacks are in service, an external, infrared thermographic examination can be made that will show hot spots, which indicate failure of the internal liner.

When liquid fuels are burned, soot accumulates in the base of the stack and must be removed occasionally. During the internal inspection, the amount of soot and ash should be noted, and whether they need to be removed should be decided. The inside of steel stacks should be inspected for corrosion or cracking due to condensation of acidic flue gases. Areas at or adjacent to welds are most susceptible to stress corrosion cracking.

Steel stacks in heater and boiler services should be inspected and checked for wall thickness at time intervals that are warranted by experience. In addition to the thickness determination, a thorough hammer inspection should be made of the entire stack, with particular attention paid to the seams, adjacent areas, and areas adjoining any stiffening rings, lugs, nozzles, and the like, which may act as cooling fins to cause condensation of gases and localized corrosion. The minimum allowable thickness at which repairs will be made should be definitely established for such structures. One practice is to establish these thicknesses on the same basis as was used in the original design for the structure.

Bolts at the base flange and at elevated sections should be checked periodically for loosening and breakage. Elevated flanged connections that are installed for the purposes of field erection should be seal welded internally to prevent the escape of corrosive flue gases, which accelerate bolt failure. In the case of derrick-type flare stacks, the structure itself should be completely inspected. Careful attention should be given to the foundations and anchor bolts. Most derricks are assembled by welding or bolting. Bolts should be checked for looseness and corrosion. If looseness is found, the shank of the bolt should be checked for abrasion from the movement of structural members. The flare-stack roller guides and guide arms should be checked for alignment and operability and should be realigned or freed if necessary. Ladders, platforms, and all structural members should be checked for atmospheric corrosion to determine whether any section is approaching the minimum allowable thickness.

The guy lines to guyed steel stacks should be inspected visually for corrosion. The wire rope should be inspected for:

a.  Reduced diameter due to internal or external corrosion.
b.  Corroded or broken wires at end connections, especially at the deadman and the top of the stack, where moisture can be retained.
c.  Cracked, bent or worn end connections.
d. Worn/broken outside wires.
e.  Kinks, cuts or unstranding.

Electromagnetic inspection techniques based upon flux leakage principles are available for inspecting wire rope as well. These technologies involve a crawler capable of inspecting the length of wire for localized strand defects and general thinning of the wire cross-section. This allows for a quantitative assessment of the wire integrity. The stack painters’ trolley and cable should be inspected visually for corrosion or mechanical damage before being used and before being returned to storage. The condition of the connections at the top of the pulley and of the trolley ring and its connections to the stack should be determined carefully.


Lightning rods on stacks and their grounding cables should be inspected visually to see that they are secured and unbroken. The ground rod should be inspected visually to see that it is firmly attached to the cable and that it extends to a ground depth sufficient to provide an electrical resistance of not more than 25 ohms. This should be checked periodically, particularly in dry weather.

The ladders on steel, concrete, and brick stacks should be inspected visually for corrosion and should be tested physically by applying test weights in excess of those that may be imposed by the personnel using them.

The caps on radial brick and concrete stacks sometimes become damaged, causing loose brick to fall or the reinforcing steel to be exposed. Stack caps should be inspected visually so that any necessary repairs can be made, thereby eliminating a hazard from falling bricks and preventing damage to steel reinforcement.

Visual Inspection of Boiler Blowdown Equipment



Valves should be inspected for tight shutoff. Piping should be checked for corrosion and leakage at all joints. Ultrasonic testing and hammer sounding are good methods of pipe inspection. Elbows and sharp bends are susceptible to erosion and should be examined for indications of thin walls and holes. Coolers should be inspected in the same manner as that described for heat exchangers in API RP 572.