Pipe Line Equipment – Pipe Line DZ


๐Ÿ”งButt Weld Type Welding Connections

45° and 90° angle cups (long half diameter)

Types of 45 ° and 90 ° angle (short radius)

3D Types

Tehat is equal

Discounted tehat

Equal Crossroads

Reduced Intersections

Central cuts

Decentralized discounts

Stub Ends

ุงู„ู Threaded Fittings

Types at a 45° and 90° angle

Equal and lowered tehat

Equal and reduced intersections

Centered and non-centered swages

⚙️ Socket Weld Fittings

Types at a 45° and 90° angle

Equal and lowered tehat

Equal and reduced intersections

Centered and non-centered swages

ุช the olets

Weldolet weldolet

Sockolet

Threadolet Threadolet

Sweepolet Sweepolet

Nipolet

๐Ÿ”— Links Unions

1. Twisted links

2. Copper welding connections

๐Ÿงฟ Flanges

1. Cupboard Welding Flares

2. Twisted Flinges

3. Slip On

4. Lap joint

5. Weld Neck Welding Flares

๐Ÿงฉ Stuffing Gaskets

1. Non metal fillings

2. Semi metal fillings

3. Metal fillings

๐Ÿ”ฉ Nuts & Bolts Saws and Bolts

1. Stud bolts

2. Mechanical Machine Bolts

---

๐Ÿšช Valves - Pipe Line DZ

ุงุช Gate Valves

1. Normal gate valve

2. Knife Edge Gate Valve

๐ŸŒ Globe Valves

๐Ÿ” Check Valves

1. oscillation check valve

2. Lift check valve

3. Piston check valve

๐Ÿฆ‹ Butterfly Valves

⚾️ Ball Valves

๐Ÿงฒ Piston Valves

๐Ÿ”Œ Plug Valves

๐Ÿชก Needle Valves

๐Ÿงผ Pinch Valve

---

St Strainers Cleaners

1. Temporary cone filters

2. Y-Strainers

3. T-Type Strainers

---

๐Ÿ”ฅ Steam Traps Steam Traps

1. Floating trap

2. Double metal trap

3. Disc trap

4. Upside down bucket trap

5. Heat trap

---

ู†ุง️ Pipe Racks Pipe Racks

1. Arrangement of the lines

2. The distance between the pipes

3. Pregnant show and elevation calculation

4. Back up space in the future

5. Distancing between the disorders of a pregnancy

6. Cable trays

7. The walking tracks

8. Risks and crossroads

9. Air coolers

10. Stretch rings

11. The anchor and the anchor peace

12. Backing up the lines

13. Service stations

14. Loading data for civil department

15. Bearing units

16. Flow meters

17. Battery Limit Valves

18. Outbursts of the Pipe Heads

---

ุน️ Tank Farms

1. Fluids codes

2. Assembling the cabinets

3. Organizing and organizing the closets

4. Firewall Account

5. Pipes burst through the wall

---

๐Ÿญ Distillation Towers

---

ุจุงุฑ Inspection, Examination & Testing

1. Optical examination of welding

2. Radiation check up

3. Check up for ultrasound waves

4. MRI testing

5. Checking for levied fluids

6. Hydrostatic testing

7. Aerial test

No comments: